Langford Green

So happy to see our beautiful green front lawn again! Langford Green is back and with it the upcoming football season!

We are excited to announce that the removal of the temporary wall on the 6th Floor Grille will begin Sunday, August 28-Tuesday, August 30. Therefore, lunch service for Monday, August 29 and Tuesday, August 30 will be held on the 5th floor; during these dates we will have the Club Table buffet available.We’re looking forward to the return of our famous Osceola Grille Stadium View when the wall comes down!

In addition to this good news, the Main Entrance to the University Center Club, as well as the Visitor's Center and Seminole Sports Shop is officially open!  We are positive that you will be very pleased with the front entrance to the Club being accessible once again! The new courtyard will take on a beautiful transformation including planters and greenery and opening up to the new elevator towers on either side of the Main Entrance.

In order to ensure your Game Day experience is a happy one, we want to clarify how the UCC & Champions Club will operate. All of you are UCC Members and the distinction is that some Members have purchased Club Seats. Champions Club single game tickets are now available to all UCC members! Single game tickets are on sale for the Charleston Southern, Wake Forest and Boston College games and include a reserved club seat, food and soft drink and access to cash bars.Full season Champions Club tickets are still available, providing a per seat credit that goes towards year round UCC membership. There are also a limited number of 3-Game Packages which include:

  • Your choice of either the Clemson 10/29 or Florida 11/26
  • Your choice of two of Charleston Southern 9/10, North Carolina 10/1, Wake Forest 10/15 or Boston College 11/11... 

To purchase please call the Boosters at 850.644.1830 line 1.

__________________________________________________________

9:30AM Courtyard Check-In Opens for All MembersYou will enter through a beautiful & welcoming new courtyard

  • Center Gates | Members with Champions Club Seats
  • East Elevator Gate | Members with Stadium Seats

UCC Members with Stadium Seats

  • 3rd floor Ballroom Level & Outdoor Patio

UCC Members with Champions Club Seats

  • 4th floor Champions Club Level
  • 6th floor Osceola Grill & Terrace Level
13923618_1204761172887532_3938594192961486720_o

Showing off our Seminole Spirit with our new Garnet and Gold lights on the terraces! More exciting news is that the new sound system for Doak Campbell Stadium is ready for the upcoming Football Season and we can't wait to try it out!

Only 4 more weeks until the first FSU Home Football Game! Go Noles!

Entrance

GAME DAY ACCOMMODATIONS UCC Members with Stadium Seats

  •      3rd Floor Ballroom Level & NEW Outdoor Patio
  •      Opens 3 hours before Kick-Off

UCC Members with Club Seats

  •      6th & 4th Floors with Terraces- UCC Members with Club Seats. 
  •      Opens 2 hours before Kick-Off.

Courtyard Check-In

  • Members will enter through a beautiful & welcoming new courtyard
  • East Gate | Members with Stadium Seats
  • Center Gate | Members with Club Seats

With renovations finally reaching their completion, the stadium is taking shape and preparing for football season. Check out the photos at the link below and see some of the amazing progress being done at Doak Campbell Stadium.

Stadium Renovation Pictures

ChampSeats

With only 43 days until the first FSU Home Football Game, amazing progress continues on the newly installed Champion Club Seats. With a great view these comfortable and spacious seats create a premium Game Day experience.

Interested in purchasing a 3 Game Ticket Packet contact the Seminole Boosters at 866-360-1506

13600251_1336894922992928_5705137670760872190_n
13592358_1335542159794871_3198496093754638210_n

Check out these amazing new areal pictures of the terrace rooftops! The newly covered terraces will provide not only comfort and shade on game days, but a premium club experience for dining and private events throughout the year!

IMG_0614 (1)

Stadium renovations continue on time, as we all prepare for the on coming football season. 
Check out the newly installed prism spears that now decorate the terrace tents. These glass spears reflect garnet light in a beautiful display of Seminole Pride. Additionally, the elevator towers have had glass windows installed all along the front wall facing the Unconquered Statue. 
We can't wait for the completed project just in time for football. Go Noles!

IMG_2105

Each side of the terrace is being set up with a fully equipped bar and concession stand. Along with a smoke house to cook Game Day Hamburgers and Hot Dogs. In addition the tent covers that will reach and cover the entire terraces will soon be installed. We can't wait to see the completed job!

IMG_6512
IMG_6514

The Sixth Floor Osceola Grille has newly installed windows in place, wider, taller and better than before. Once the extension of the terraces and the renovations on the sixth floor are complete Members will be able to once again enjoy their favorite stadium view of Doak Campbell Stadium.

There are only 95 days left until construction is completed and we can not wait to see the final result!!

1.1

Due to construction the University Center Club has opened additional available parking in the student lot. Members may park in the first two lanes of the Student Lot (shown above in the yellow circle).

The Student Lot is located on the left side of the Unconquered Statue or on the opposite side to the Visitor Lot. Members need only to show their Membership Card to the attendant in the parking lot to gain access.

bar

Continued development of Doak Campbell Stadium is making great headway, the elevator towers have been almost completely covered with the famous red bricks to match the rest of the stadium.

The 4th floor Champions Club has taken shape and the construction of main bar has begun (as seen above). The 6th floor dining area is still in the process of being extended, but the walkway that will be in front of the dining area has been built and will be revealed when construction is completed.

Also the first floor main entrance to University Building B is currently under construction. For alternate entrance and parking information visit our website.

Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30